UST tester forms by state
Which official form each test fills, taken from the app itself. Tap a state.
Alabama 10 tests on the state's own form
- Spill buckets: ADEM Form 20 3 Year Spill Prevention Equipment (Spill Bucket) Integrity Test Report
- Containment sumps: ADEM Form 557 3 Year Containment Sump Integrity Test Report
- Low level sump test: Alabama ADEM Form 556 3 Year Containment Sump Integrity Test Report (Low Level Method)
- Overfill prevention: Alabama ADEM Form 559 3 Year Overfill Prevention Equipment Inspection Report
- Line leak detectors: ADEM Form 551 Automatic Line Leak Detector (ALLD) Test Report
- Line tightness: ADEM Form 477 Line Tightness Test Report, with the full readings behind it
- Tank tightness: ADEM's tank tightness test report for the method used
- Tank gauge (ATG): ADEM Form 565 Annual Tank Gauge Test Report
- Leak sensors: ADEM Form 564 Annual Liquid Sensor Inspection and Functionality Test
- Cathodic protection: ADEM Form 545 Cathodic Protection Monitoring Form for Galvanic Systems; ADEM Form 332 Cathodic Protection Monitoring Form for Impressed Current Systems
Every other test: a full UST Tester report with every reading, the result and the rule.
Alaska full test report
Alaska does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
Arizona 3 tests on the state's own form
- Spill buckets: Arizona ADEQ Hydrostatic Testing for Spill Buckets; Arizona ADEQ Vacuum Testing for Spill Buckets
- Containment sumps: Arizona ADEQ High Level Hydrostatic Testing
- Low level sump test: Arizona ADEQ Low Level Hydrostatic Testing
Every other test: a full UST Tester report with every reading, the result and the rule.
Arkansas 1 test on the state's own form
- Spill buckets: Arkansas 3-Year Spill Prevention Equipment (Spill Bucket) Test Form
Every other test: a full UST Tester report with every reading, the result and the rule.
California 6 tests on the state's own form
- Spill buckets: California Appendix VIII Spill Container Testing Report Form
- Containment sumps: California Appendix VII Secondary Containment Testing Report Form
- Overfill prevention: California Appendix IX Overfill Prevention Equipment Inspection Report Form
- Tank and piping interstice: California Appendix VII Secondary Containment Testing Report Form, tank and piping page
- Monitoring certification: California Appendix VI Monitoring System Certification Form
- Walkthrough inspection: California Appendix XIII Designated UST Operator Visual Inspection Report
Every other test: a full UST Tester report with every reading, the result and the rule.
Colorado 4 tests on the state's own form
- Spill buckets: Colorado OPS Secondary Containment and Spill Prevention Equipment Tightness Testing
- Containment sumps: Colorado OPS Secondary Containment and Spill Prevention Equipment Tightness Testing
- Low level sump test: Colorado OPS Secondary Containment and Spill Prevention Equipment Tightness Testing
- Tank and piping interstice: Colorado OPS Secondary Containment and Spill Prevention Equipment Tightness Testing
Every other test: a full UST Tester report with every reading, the result and the rule.
Connecticut 1 test on the state's own form
- Annual inspection: Connecticut DEEP UST Annual Inspection Checklist/Report
Every other test: a full UST Tester report with every reading, the result and the rule.
Delaware 3 tests on the state's own form
- Spill buckets: Delaware DNREC Spill Containment Device (Spill Bucket) Test Report, with the full readings behind it
- Containment sumps: Delaware DNREC Containment Sump (Tank Top and Dispenser) Test Report, with the full readings behind it
- Low level sump test: Delaware DNREC Containment Sump (Tank Top and Dispenser) Test Report, with the full readings behind it
Every other test: a full UST Tester report with every reading, the result and the rule.
District of Columbia 3 tests on the state's own form
- Spill buckets: DC DOEE UST Spill Prevention Equipment/Containment Sump Integrity Testing Form
- Containment sumps: DC DOEE UST Spill Prevention Equipment/Containment Sump Integrity Testing Form
- Low level sump test: DC DOEE UST Spill Prevention Equipment/Containment Sump Integrity Testing Form
Every other test: a full UST Tester report with every reading, the result and the rule.
Florida full test report
Florida does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
Georgia 8 tests on the state's own form
- Spill buckets: Georgia EPD 3 Year Spill Bucket Test
- Containment sumps: Georgia EPD 3 Year Containment Sump Test
- Low level sump test: Georgia EPD Containment Sump Low Level Test
- Overfill prevention: Georgia EPD 3 Year Flapper/Valve Inspection; Georgia EPD 3 Year Ball Float Inspection; Georgia EPD 3 Year Overfill Alarm Inspection
- Line leak detectors: Georgia EPD Line Leak Detector Test
- Tank gauge (ATG): Georgia EPD ATG and Probe Test
- Leak sensors: Georgia EPD Liquid Sensor Test
- Cathodic protection: Georgia EPD Cathodic Protection Evaluation, Galvanic; Georgia EPD Cathodic Protection Evaluation, Impressed Current
Every other test: a full UST Tester report with every reading, the result and the rule.
Hawaii full test report
Hawaii does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
Idaho 9 tests on the state's own form
- Spill buckets: Idaho DEQ Overfill Prevention Inspection, Spill Bucket and Containment Sump Testing Form
- Containment sumps: Idaho DEQ Overfill Prevention Inspection, Spill Bucket and Containment Sump Testing Form
- Low level sump test: Idaho DEQ Overfill Prevention Inspection, Spill Bucket and Containment Sump Testing Form, DEQ alternate method box
- Overfill prevention: Idaho DEQ Overfill Prevention Inspection, Spill Bucket and Containment Sump Testing Form
- Line leak detectors: Idaho DEQ Line Leak Detector and Line Tightness Test Form
- Line tightness: Idaho DEQ Line Leak Detector and Line Tightness Test Form
- Tank gauge (ATG): Idaho DEQ Release Detection Equipment Testing Form
- Leak sensors: Idaho DEQ Release Detection Equipment Testing Form
- Cathodic protection: Idaho DEQ Cathodic Protection Test Report (DEQ publishes it in Word; the app draws it)
Every other test: a full UST Tester report with every reading, the result and the rule.
Illinois full test report
Illinois does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
Indiana full test report
Indiana does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
Iowa 7 tests on the state's own form
- Spill buckets: Iowa DNR Secondary Containment Testing Report Form, spill bucket page
- Containment sumps: Iowa DNR Secondary Containment Testing Report Form
- Low level sump test: Iowa DNR Secondary Containment Testing Report Form
- Line tightness: Iowa DNR Line Tightness Test Form
- Cathodic protection: Iowa DNR UST Cathodic Protection Inspection Form
- Tank and piping interstice: Iowa DNR Secondary Containment Testing Report Form, tank and piping pages
- Pressure or vacuum monitoring: Iowa DNR Secondary Containment Testing Report Form, vacuum and pressure sensor page
Every other test: a full UST Tester report with every reading, the result and the rule.
Kansas full test report
Kansas does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
Kentucky 10 tests on the state's own form
- Spill buckets: Kentucky DWM 4222 UST Containment Device Test
- Containment sumps: Kentucky DWM 4222 UST Containment Device Test
- Low level sump test: Kentucky DWM 4222 UST Containment Device Test
- Overfill prevention: Kentucky DWM 4232 UST Overfill Prevention Device Test
- Line leak detectors: Kentucky DWM 4221 UST Automatic Line Leak Detector Operational Test
- Line tightness: Kentucky DWM 4229 UST Line Tightness Test
- Tank tightness: Kentucky DWM 4235 UST Tank Tightness Test
- Tank gauge (ATG): Kentucky DWM 4223 UST Electronic Release Detection Equipment Test
- Leak sensors: Kentucky DWM 4223 UST Electronic Release Detection Equipment Test
- Cathodic protection: Kentucky DWM 4226 UST Galvanic Cathodic Protection Evaluation
Every other test: a full UST Tester report with every reading, the result and the rule.
Louisiana 3 tests on the state's own form
- Containment sumps: Louisiana DEQ UST Containment Sump Integrity Verification Under High Tank Hold Water Level Conditions Form
- Low level sump test: Louisiana DEQ UST Containment Sump Low Liquid Level Hydrostatic Test Procedures Form
- Cathodic protection: Louisiana DEQ UST-CP-01 Galvanic Cathodic Protection System Evaluation; Louisiana DEQ UST-CP-02 Impressed Current Cathodic Protection System Evaluation, with UST-CP-03 started for the owner
Every other test: a full UST Tester report with every reading, the result and the rule.
Maine 4 tests on the state's own form
- Spill buckets: Maine DEP UST-53 Sump Tightness Testing Report, spill bucket page
- Containment sumps: Maine DEP UST-53 Sump Tightness Testing Report
- Low level sump test: Maine DEP UST-53 Sump Tightness Testing Report
- Annual inspection: Maine DEP UST-01 Annual Inspection Report
Every other test: a full UST Tester report with every reading, the result and the rule.
Maryland 3 tests on the state's own form
- Spill buckets: Maryland MDE Catchment Basin and Containment Sump Test Report
- Containment sumps: Maryland MDE Catchment Basin and Containment Sump Test Report
- Low level sump test: Maryland MDE Catchment Basin and Containment Sump Test Report
Every other test: a full UST Tester report with every reading, the result and the rule.
Massachusetts full test report
Massachusetts does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
Michigan full test report
Michigan does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
Minnesota 2 tests on the state's own form
- Spill buckets: MPCA UST spill bucket integrity testing form
- Containment sumps: MPCA UST containment sump integrity testing form
Every other test: a full UST Tester report with every reading, the result and the rule.
Mississippi 3 tests on the state's own form
- Spill buckets: Mississippi MDEQ Annual Spill Bucket Integrity Testing
- Containment sumps: Mississippi MDEQ Containment Sump Integrity Testing
- Line leak detectors: Mississippi MDEQ Annual Automatic Line Leak Detector Testing
Every other test: a full UST Tester report with every reading, the result and the rule.
Missouri full test report
Missouri does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
Montana full test report
Montana does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
Nebraska full test report
Nebraska does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
Nevada full test report
Nevada does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
New Hampshire full test report
New Hampshire does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
New Jersey 1 test on the state's own form
- Low level sump test: NJDEP New Jersey Containment Sump Testing Form
Every other test: a full UST Tester report with every reading, the result and the rule.
New Mexico full test report
New Mexico does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
New York full test report
New York does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
North Carolina 11 tests on the state's own form
- Spill buckets: North Carolina UST-6D/23A Triennial Spill Bucket Integrity Testing
- Containment sumps: North Carolina UST-6F/23B Triennial Containment Sump/UDC Integrity Testing
- Low level sump test: North Carolina UST-6F/23B Triennial Containment Sump/UDC Integrity Testing, low liquid level page
- Overfill prevention: North Carolina UST-22A Overfill Prevention Equipment Operability Check
- Line leak detectors: North Carolina UST-22B Annual Leak Detection Equipment Operability Check
- Tank gauge (ATG): North Carolina UST-22B Annual Leak Detection Equipment Operability Check, tank gauge and spill bucket gauge page
- Leak sensors: North Carolina UST-22B Annual Leak Detection Equipment Operability Check, interstitial sensor page
- Tank and piping interstice: North Carolina UST-6E/23D Tank Interstice Testing (installation or triennial) for tanks and UST-6H/23C Triennial UST Piping Integrity Testing for piping
- Groundwater or vapor monitoring: North Carolina UST-22B Annual Leak Detection Equipment Operability Check, groundwater, vapor and handheld equipment page
- Walkthrough inspection: North Carolina UST-27 Monthly Walkthrough Inspections, this month's column with the year's earlier months
- Sump visual inspection: North Carolina UST-22C Annual Sump Visual Inspections
Every other test: a full UST Tester report with every reading, the result and the rule.
North Dakota 4 tests on the state's own form
- Spill buckets: North Dakota DEQ Spill Bucket Integrity Testing, Hydrostatic Testing Method (SFN 62224); North Dakota DEQ Spill Bucket Integrity Testing, Vacuum Testing Method (SFN 62223)
- Containment sumps: North Dakota DEQ Containment Sump Integrity Testing, Hydrostatic Testing Method (SFN 62222)
- Overfill prevention: North Dakota DEQ Overfill Equipment Inspection, Automatic Shutoff Device (SFN 62218); North Dakota DEQ Overfill Equipment Inspection, Ball Float Valve (SFN 62217)
- Tank gauge (ATG): North Dakota DEQ Automatic Tank Gauge Operation Inspection (SFN 62220)
Every other test: a full UST Tester report with every reading, the result and the rule.
Ohio full test report
Ohio does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
Oklahoma 6 tests on the state's own form
- Spill buckets: Oklahoma OCC Liquid Tightness Tests for Spill Buckets and Containment Sumps
- Containment sumps: Oklahoma OCC Liquid Tightness Tests for Spill Buckets and Containment Sumps
- Low level sump test: Oklahoma OCC Low Liquid Level UST Containment Sump Alternative Testing Form
- Overfill prevention: Oklahoma OCC Overfill Equipment Inspection Recordkeeping Form
- Line tightness: Oklahoma OCC Hydrostatic Line Tightness Test
- Cathodic protection: Oklahoma OCC Cathodic Protection System Survey, with the full readings report
Every other test: a full UST Tester report with every reading, the result and the rule.
Oregon full test report
Oregon does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
Pennsylvania 10 tests on the state's own form
- Spill buckets: Pennsylvania DEP Spill Prevention Equipment/Containment Sump Integrity Testing Form
- Containment sumps: Pennsylvania DEP Spill Prevention Equipment/Containment Sump Integrity Testing Form
- Low level sump test: Pennsylvania DEP Spill Prevention Equipment/Containment Sump Integrity Testing Form
- Overfill prevention: Pennsylvania DEP Overfill Prevention Evaluation Form
- Line leak detectors: Pennsylvania DEP Automatic Line Leak Detector Functionality Testing Form
- Tank gauge (ATG): Pennsylvania DEP Automatic Tank Gauge Functionality Testing Form
- Leak sensors: Pennsylvania DEP Sensor Functionality Testing Form
- Cathodic protection: Pennsylvania DEP UST Cathodic Protection System Evaluation Form
- Pressure or vacuum monitoring: Pennsylvania DEP Pressure/Vacuum Monitoring Functionality Testing Form
- Groundwater or vapor monitoring: Pennsylvania DEP Groundwater/Vapor Monitoring System Functionality Testing Form
Every other test: a full UST Tester report with every reading, the result and the rule.
Rhode Island 8 tests on the state's own form
- Spill buckets: Rhode Island DEM Standardized Hydrostatic Tightness Testing Form; Rhode Island DEM Standardized Vacuum Tightness Testing Form
- Containment sumps: Rhode Island DEM Standardized Hydrostatic Tightness Testing Form; Rhode Island DEM Standardized Vacuum Tightness Testing Form
- Low level sump test: Rhode Island DEM Standardized Hydrostatic Tightness Testing Form, low level
- Overfill prevention: Rhode Island DEM Standardized Annual Testing Form for UST Systems, overfill page
- Line leak detectors: Rhode Island DEM Standardized Annual Testing Form for UST Systems, line leak detector page
- Tank gauge (ATG): Rhode Island DEM Standardized Annual Testing Form for UST Systems, tank gauge page
- Leak sensors: Rhode Island DEM Standardized Annual Testing Form for UST Systems, monitoring system and sensor page
- Shear valves: Rhode Island DEM Standardized Annual Testing Form for UST Systems, shear valve page
Every other test: a full UST Tester report with every reading, the result and the rule.
South Carolina 7 tests on the state's own form
- Spill buckets: South Carolina DES 2562 Spill Bucket Integrity Testing
- Containment sumps: South Carolina D-3183 Containment Sump Integrity Testing
- Overfill prevention: South Carolina DES 3187 Overfill Prevention Equipment Operability Check
- Line leak detectors: South Carolina D-3316 Automatic Line Leak Detector (LLD) Function Check
- Line tightness: South Carolina D-3315 Line Tightness Testing Form
- Tank gauge (ATG): South Carolina D-3188 Release Detection Equipment Testing, tank gauge sections
- Leak sensors: South Carolina D-3188 Release Detection Equipment Testing, interstitial monitoring section
Every other test: a full UST Tester report with every reading, the result and the rule.
South Dakota 2 tests on the state's own form
- Containment sumps: South Dakota DANR Containment Sump Equipment Testing Form
- Low level sump test: South Dakota DANR Containment Sump Equipment Testing Form
Every other test: a full UST Tester report with every reading, the result and the rule.
Tennessee 8 tests on the state's own form
- Spill buckets: Tennessee CN-1366 Spill Prevention Device Hydrostatic Test Report
- Containment sumps: Tennessee CN-2664 Containment Sump Integrity Hydrostatic Test Report
- Low level sump test: Tennessee CN-2644 Low Level Containment Sump Integrity Hydrostatic Test Report
- Overfill prevention: Tennessee CN-2584 Overfill Prevention Inspection
- Line leak detectors: Tennessee CN-1341 Precision Line Tightness and Leak Detector Test Report
- Line tightness: Tennessee CN-1341 Precision Line Tightness and Leak Detector Test Report: sections I to IV and the worksheet for your method (Petro Tite, Acurite, Ezy Chek, TLD 1, PM2), or the full readings for any other
- Tank gauge (ATG): Tennessee CN-2624 Annual Automatic Tank Gauge Operability Test Report
- Leak sensors: Tennessee CN-1339 Annual Electronic Interstitial Monitoring Test Report
Every other test: a full UST Tester report with every reading, the result and the rule.
Texas full test report
Texas does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.
Utah 1 test on the state's own form
- Containment sumps: Utah DERR Containment Sump Test, Hydrostatic Test Form
Every other test: a full UST Tester report with every reading, the result and the rule.
Vermont 6 tests on the state's own form
- Spill buckets: Vermont DEC Spill Bucket Containment Testing
- Containment sumps: Vermont DEC Tank Top Sump Tightness Testing
- Overfill prevention: Vermont DEC Overfill Prevention Equipment Testing
- Line leak detectors: Vermont DEC Line Leak Detector and Shear Valve(s) Testing
- Line tightness: Vermont DEC Piping Tightness Testing, with the full readings behind it
- Shear valves: Vermont DEC Line Leak Detector and Shear Valve(s) Testing, shear valve counts
Every other test: a full UST Tester report with every reading, the result and the rule.
Virginia 8 tests on the state's own form
- Spill buckets: Virginia DEQ Triennial UST Spill Bucket Integrity Testing
- Containment sumps: Virginia DEQ Triennial UST Containment Sump / UDC Integrity Testing
- Low level sump test: Virginia DEQ Triennial UST Containment Sump / UDC Integrity Testing, low liquid level page
- Overfill prevention: Virginia DEQ Triennial Overfill Prevention Equipment Functionality Test
- Line leak detectors: Virginia DEQ Annual Leak Detection Equipment Operability Check, line leak detector page
- Tank gauge (ATG): Virginia DEQ Annual Leak Detection Equipment Operability Check, tank gauge page
- Leak sensors: Virginia DEQ Annual Leak Detection Equipment Operability Check, interstitial sensor page
- Groundwater or vapor monitoring: Virginia DEQ Annual Leak Detection Equipment Operability Check, groundwater, vapor and handheld equipment page
Every other test: a full UST Tester report with every reading, the result and the rule.
Washington 1 test on the state's own form
- Visit checklist: Washington Ecology ECY 070-69 Leak Testing Checklist for USTs
Every other test: a full UST Tester report with every reading, the result and the rule.
West Virginia 7 tests on the state's own form
- Spill buckets: West Virginia DEP Spill and Overfill Testing Report Form, spill bucket section, with the full readings behind it
- Containment sumps: West Virginia DEP Interstitial Monitoring Testing Report Form, section F
- Low level sump test: West Virginia DEP Interstitial Monitoring Testing Report Form, section F
- Overfill prevention: West Virginia DEP Spill and Overfill Testing Report Form, overfill pages, with the full readings behind it
- Tank gauge (ATG): West Virginia DEP ATG Testing Report Form
- Leak sensors: West Virginia DEP Interstitial Monitoring Testing Report Form, section G
- Cathodic protection: West Virginia DEP Cathodic Protection, Galvanic (WVDEP publishes it in Word; the app draws it); West Virginia DEP Cathodic Protection, Impressed Current (WVDEP publishes it in Word; the app draws it)
Every other test: a full UST Tester report with every reading, the result and the rule.
Wisconsin 2 tests on the state's own form
- Line leak detectors: Wisconsin DATCP TR-WM-123 ALLD Annual Functionality
- System verification: Wisconsin DATCP TR-WM-139 Underground Tank System Functionality Verification
Every other test: a full UST Tester report with every reading, the result and the rule.
Wyoming full test report
Wyoming does not publish its own tester form for these tests, so UST Tester makes a complete report: site, owner, tester and certification, equipment, every reading, pass or fail with the rule it comes from, and your signature.